Skylights and roof glazing

Skylights and roof glazing rough-in inspection checklist

Skylights and roof glazing rough-in is the last time the work is fully visible. Once the cover inspection passes and the walls, ceilings and slabs close, every defect left behind becomes a demolition bill. This checklist walks the rough-in in the order the work goes in, with the photo each item needs before it gets buried. Work is commonly verified against the applicable building code, NRCA roofing guidance, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Fall protection at openings

  • Openings guarded or covered before anyone walks the curbs

    Every skylight opening in the roof area has the guardrail, secured cover or screen the site's fall protection plan calls for; if one is open, stop and report it to the super.

  • Fall protection plan and cover markings checked for this roof

    Site fall protection plan reviewed with the super for this roof area; covers fastened against displacement, marked as covers and rated for the load the plan states.

    No photo
02

Units on site

  • Frame and unit labels match the approved submittal

    Manufacturer's label or carton on each frame and unit read for model, size and glazing type and compared with the approved submittal and the opening's schedule mark.

  • Units stored crated, secured and away from roof edges

    Crated units stored as the carton marks direct (flat or on edge), covered, tied down against wind and kept clear of roof edges and open curbs.

03

Curb and opening

  • Curb square, level and to the required height

    Curb built plumb and square to the opening, top level, upstand at or above the height the manufacturer and roof assembly call for so base flashing turns up full.

  • Opening framed and blocked to carry the unit

    Header and trimmers sized for the opening, curb fastened to solid framing not just decking, no soft spots under the anchor line.

  • Curb outside size measured against the unit's frame

    Curb outside dimensions taped at both directions and compared with the range the manufacturer lists for this unit, so the frame seats without forcing or open gaps.

04

Flashing and membrane tie-in

  • Flashing lapped shingle-fashion and tied to the roof

    Base, step and counterflashing woven with the drainage so upslope water sheds over each lap, membrane turned up the curb and terminated, no reliance on sealant as the primary seal.

  • Upslope diverter or cricket where the run demands it

    On wide curbs or low slope, a cricket or diverter behind the unit splitting water around the curb instead of ponding against the upslope flashing.

    No photo
  • Curb and flashing details for each unit type on hand

    Manufacturer's curb and flashing drawing and the current roofing details at the roof for each unit type, with the curb height and counterflashing lap they call for noted before flashing starts.

    No photo
  • Counterflashing parts match the manufacturer's detail

    Counterflashing or kit parts on site checked by label against the manufacturer's detail for this unit and roof covering, no field-bent substitutes the roofing details do not show.

05

Concealment signoff

  • Tie-in photographed before the roof covers it

    Each opening's flashing and membrane termination documented open, curb height and laps visible, before shingles or cover board close the transition for good.

  • Skylight schedule checked off opening by opening

    Every opening on the skylight schedule found on the roof with its mark, curb built and flashed; missing, moved or extra openings reported to the super.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • Curb set low so the membrane base flashing turns up short of the height the manufacturer calls for, and standing water finds the top of the flashing in the first hard rain.
  • Flashing lapped against the drainage instead of shingle-fashion with the water, so the upslope side counts on sealant alone and leaks once the sealant ages.
  • Curb set out of square or racked to the deck, so the unit will not seat evenly and the perimeter gasket is pinched on one side and open on the other.

Common questions

6 answers

What does this skylights and roof glazing rough-in checklist cover?
13 items across 5 sections, covering fall protection at openings, units on site, curb and opening, flashing and membrane tie-in, and more. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The skylight installer setting curbs and frames with the roofing foreman, or the GC's superintendent walking each opening before the roof closes over the tie-in.
When in the schedule should this walk happen?
As curbs and frames are set on the framed openings and the flashing is woven into the roof, before the membrane or shingles cover the transition and before the unit is glazed.
Why do these items ask for a photo?
9 of the 13 items call for photo evidence, 12 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a skylights and roof glazing rough-in inspection?
Curb set low so the membrane base flashing turns up short of the height the manufacturer calls for, and standing water finds the top of the flashing in the first hard rain. Flashing lapped against the drainage instead of shingle-fashion with the water, so the upslope side counts on sealant alone and leaks once the sealant ages. Curb set out of square or racked to the deck, so the unit will not seat evenly and the perimeter gasket is pinched on one side and open on the other.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 12 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.