Wood flooring punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Repair

  • Squeaks and loose boards resolved

    Squeaking or loose areas traced and re-secured, repair blending into the finish, no new face damage.

    No photo
  • Gaps and finish blemishes corrected

    Seasonal gaps assessed, scratches, dents and finish blemishes touched up or the board replaced, sheen matched.

    No photo
  • Room humidity and board moisture read at the callback

    Hygrometer and moisture meter readings recorded with the punch item, so gaps or cupping are traced to building conditions before anything is repaired.

  • Perimeter walked for peaking or lifting

    Each wall line and threshold checked for raised seams or lifted boards where the floor ran out of expansion room; relief made per the manufacturer where found.

  • Finish adhesion checked along traffic paths

    Finish at entries, halls and in front of sinks free of peeling, flaking or white haze between coats; failed areas abraded and recoated per the finish manufacturer.

  • Water-stained boards traced to a fixed source before repair

    Where boards show staining or cupping from a leak, the source (plumbing, door, window or slab) is identified and fixed by that trade before boards are replaced.

    No photo
02

Transitions

  • Transition and trim complete and secure

    Thresholds, reducers and base fastened, profile correct at each doorway and change of material, nothing loose underfoot.

03

Turnover

  • Touch-up and recoat areas cured before the room is released

    Punch touch-ups and recoated areas given the finish manufacturer's dry time before furniture or other trades return to the room.

    No photo
  • Finish system and sheen recorded for future recoats

    Finish manufacturer, product, sheen and number of coats written into the turnover record, so a later screen and recoat uses a compatible finish.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • A squeak chased with a face-nail through the finish instead of finding the loose board or subfloor fastener.
  • A transition strip at a doorway left loose or the wrong profile, so it catches underfoot and the gap shows.

Common questions

6 answers

What does this wood flooring punch checklist cover?
9 items across 3 sections, covering repair, transitions, turnover. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The flooring lead on a callback, or the GC's superintendent clearing flooring punch before turnover.
When in the schedule should this walk happen?
During closeout, after the floor has been through a heating or cooling season enough to move and after other trades have finished in the room.
Why do these items ask for a photo?
4 of the 9 items call for photo evidence, 4 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a wood flooring punch inspection?
A squeak chased with a face-nail through the finish instead of finding the loose board or subfloor fastener. A transition strip at a doorway left loose or the wrong profile, so it catches underfoot and the gap shows.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 4 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.