Exterior deckingExterior decking punch checklist
Exterior decking punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against the applicable building code, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Boards and fasteners
Loose boards and popped fasteners corrected
Loose or cupped boards re-fastened into sound framing, popped fasteners set or replaced, surface left flat and tight.
No photoBoard gaps checked open after the first warm spell
Side and end gaps still open across every run, no boards buckled or pushed tight to the house or posts; tight spots re-gapped per the decking maker.
Board faces checked for rust, tannin and tool marks
Composite faces cleaned of rust spots, scuffs and cutting dust with the cleaner the maker lists; wood boards checked for tannin or fastener staining.
Exposed cut ends treated or covered as the maker directs
Field-cut board ends, fascia and stair treads end-sealed, capped or hidden by fascia per the decking maker, no raw core or untreated wood left at an edge.
Guards and finish
Wobbly guards re-anchored and finish re-checked
Guards and railings re-anchored to blocking and re-tested for movement, damaged boards or finish repaired, item photographed closed.
No photoPost caps and rail tops checked tight and shedding water
Post caps and top rails fastened with no rocking, no water standing in post sleeves or on flat rail tops, loose caps re-set with the specified adhesive or screw.
No photo
Water, connections and release
Wall below the deck door checked dry after rain or a hose test
Rim, siding and the interior below the door sill checked after rain or a hose test, with water leaving over the flashing and not behind the deck.
No photoConnections visible from below re-checked after first use
Where the underside can be reached, hangers, post bases and lateral connectors still tight, shrinkage gaps at bolts noted, loose ledger or beam nuts re-tightened.
No photoOwner's deck walk items merged and closed before release
Items from the owner's and architect's deck walk added to the crew list, each closed with a photo reference before the deck is released for use.
No photo
What usually sends this back
The failures are almost always the evidence, not the work
- A fastener that popped or a board that squares up loose re-driven at the surface without checking the joist below it is still sound.
- A guard that developed a wobble tightened at the visible screw but never re-anchored to blocking, so it works loose again.
Common questions
6 answers
- What does this exterior decking punch checklist cover?
- 9 items across 3 sections, covering boards and fasteners, guards and finish, water, connections and release. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The deck crew on a callback, or the GC's superintendent clearing deck punch items before turnover.
- When in the schedule should this walk happen?
- During closeout, after the deck has been used and after the first weather cycle reveals movement and fastener pops.
- Why do these items ask for a photo?
- 3 of the 9 items call for photo evidence, 3 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails an exterior decking punch inspection?
- A fastener that popped or a board that squares up loose re-driven at the surface without checking the joist below it is still sound. A guard that developed a wobble tightened at the visible screw but never re-anchored to blocking, so it works loose again.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 3 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.
See all 508 checklists · 6741 items and 5984 photo requirements in total.