Operable partitions

Operable partitions punch checklist

Operable partitions punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Operation and seals

  • Dragging panels adjusted and re-cycled

    Binding or dragging panel adjusted, wall cycled again through a full extend and stack, movement confirmed smooth.

    No photo
  • Seal gaps closed top and bottom

    Any light or air gap at the top or bottom seals traced and adjusted, seals confirmed in contact across the closed run.

    No photo
  • Track sighted for sag after the final-walk cycles

    Track sighted along its run with the wall extended; any sag or loosened hanger reported against the support above rather than adjusted out at the panels.

    No photo
  • Carriers listened to for grinding or squeal while cycling

    Wall cycled and carriers at the panel tops checked for grinding, squeal or clicking; worn carriers and loose hanger bolts serviced by the installer.

    No photo
02

Latch and closure

  • Latch and jamb closure adjusted

    Closure panel and any latch adjusted to close tight at the jamb without forcing, both ends checked.

  • Panel edges and seal strips checked for wear from cycling

    Vertical edges, interlocking profiles and seal strips checked after the final-walk cycles; torn, peeling or chafed trim repaired or replaced by the installer.

  • Powered-wall stops re-run after any track or panel adjustment

    Where the wall is powered, the installer re-runs the obstruction and stop devices after punch adjustments, with the super observing the wall stop.

    No photo
03

Finish and staff issues

  • Panel faces cleaned of handling marks and temporary labels

    Fingerprints, pencil marks, protective film and shipping labels removed from both faces of every panel, including the faces stored in the pocket.

  • Staff-reported operating problems logged and closed

    Issues from the people who run the wall (stiff stacking, seals not dropping, latch trouble) listed, each closed with the installer's fix and date.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • A dragging panel adjusted at the shoe when the real cause is the track loading down under weight, so the drag comes right back.
  • Seal gap chased at the panel while the top seal is the one not deploying fully, so the acoustic complaint stays.

Common questions

6 answers

What does this operable partitions punch checklist cover?
9 items across 3 sections, covering operation and seals, latch and closure, finish and staff issues. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The partition installer on a callback, or the GC's superintendent closing partition punch items.
When in the schedule should this walk happen?
During closeout, once the room is fully finished and the wall has been cycled a few times in real use.
Why do these items ask for a photo?
3 of the 9 items call for photo evidence, 3 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails an operable partitions punch inspection?
A dragging panel adjusted at the shoe when the real cause is the track loading down under weight, so the drag comes right back. Seal gap chased at the panel while the top seal is the one not deploying fully, so the acoustic complaint stays.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 3 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.