Toilet partitions and accessories

Toilet partitions and accessories punch checklist

Toilet partitions and accessories punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against the applicable building code, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

Items
3
Photos required
5

Who runs it

The accessories installer on a callback, or the GC's superintendent closing restroom punch items.

When in the schedule

During closeout, after use and cleaning reveal doors out of adjustment and panels scratched by other trades.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Repair and adjust

  • Each item located and photographed in context

    A close shot of the loose hardware, scratch or missing fastener plus a wide shot locating the stall or wall.

    2 photos
  • Latches, hinges and fasteners set and complete

    Latch and strike aligned, hinge swing corrected, and every panel and accessory fastener present and tight after adjustment.

    2 photos
02

Signoff

  • No remaining restroom items before the area is released

    All punch items in each restroom closed with photos, grab bars re-checked tight, before the room is turned over.

    1 photo

What usually sends this back

The failures are almost always the evidence, not the work

  • A latch adjusted to close but not to align with the strike, so the occupancy indicator reads wrong.
  • A scratched or dented panel touched up instead of replaced, leaving a visible mark at eye level.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 5 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered3 of 3
Photos attached2 of 5
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Common questions

What does this toilet partitions and accessories punch checklist cover?
3 items across 2 sections, covering repair and adjust, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The accessories installer on a callback, or the GC's superintendent closing restroom punch items.
When in the schedule should this walk happen?
During closeout, after use and cleaning reveal doors out of adjustment and panels scratched by other trades.
Why does every item ask for a photo?
5 of the 3 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a toilet partitions and accessories punch inspection?
A latch adjusted to close but not to align with the strike, so the occupancy indicator reads wrong. A scratched or dented panel touched up instead of replaced, leaving a visible mark at eye level.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.