Skip to content
RTI

Free checklist

Toilet partitions and accessories

Toilet partitions and accessories punch checklist

Toilet partitions and accessories punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against the applicable building code, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Repair and adjust

  • Each item located and photographed in context

    A close shot of the loose hardware, scratch or missing fastener plus a wide shot locating the stall or wall.

  • Latches, hinges and fasteners set and complete

    Latch and strike aligned, hinge swing corrected, and every panel and accessory fastener present and tight after adjustment.

02

Finish condition

  • Panel, door and pilaster faces walked in raking light

    Scratches, dents, chipped edges and delamination marked; damaged pieces replaced or refinished per the manufacturer's repair guidance, not only touched up.

  • Accessory faces cleaned with film fully removed

    Protective film peeled from every dispenser, bar and mirror frame, stainless wiped with the grain, dented or scratched units noted for replacement.

  • Mirrors secure with edges and backing intact

    Each mirror tight in its frame or clips, no chipped corners, cracks or silvering loss at the edges, frame screws present.

  • Wall finish around every flange and escutcheon inspected

    No oversized anchor holes, cracked tile or bare patches showing past a flange; damage reported to the finish trade with its room and wall.

03

Signoff

  • No remaining restroom items before the area is released

    All punch items in each restroom closed with photos, grab bars re-checked tight, before the room is turned over.

  • Back-ordered panels and accessories logged with a return date

    Any replacement panel, door or accessory on order recorded against its room, with the expected delivery and the installer's return visit.

    No photo
  • Owner's contact walked through doors and keyed dispensers

    Facility contact shown the adjusted latches, the dispenser keys and how each unit reloads, and told who takes warranty callbacks.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • A latch adjusted to close but not to align with the strike, so the occupancy indicator reads wrong.
  • A scratched or dented panel touched up instead of replaced, leaving a visible mark at eye level.

Common questions

6 answers

What does this toilet partitions and accessories punch checklist cover?
9 items across 3 sections, covering repair and adjust, finish condition, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The accessories installer on a callback, or the GC's superintendent closing restroom punch items.
When in the schedule should this walk happen?
During closeout, after use and cleaning reveal doors out of adjustment and panels scratched by other trades.
Why do these items ask for a photo?
7 of the 9 items call for photo evidence, 9 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a toilet partitions and accessories punch inspection?
A latch adjusted to close but not to align with the strike, so the occupancy indicator reads wrong. A scratched or dented panel touched up instead of replaced, leaving a visible mark at eye level.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 9 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.