SignageSignage punch checklist
Signage punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against the applicable building code, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Alignment and faces
Alignment corrected and faces inspected
Signs re-leveled and brought back to a common line, faces checked for scratches, chips and film left behind by other trades, damaged faces flagged for replacement.
Every sign pressed at its edges and checked for looseness
Each sign pushed at the corners after adjacent work, lifting tape or adhesive mounts and loose fasteners re-secured, no rocking against the wall.
Faces cleaned with the sign manufacturer's listed cleaner
Dust and fingerprints removed with the cleaner the manufacturer lists, no solvent haze, swirl scratches or lifted vinyl copy from cleaning.
Signs clear of finished door hardware and door swing
Each sign checked with the door hung and hardware on: leaf, closer and lever clear of the sign; any sign blocked or blocking listed for relocation.
Wall finish around each sign free of installer damage
Scuffs, drill marks, anchor holes from moved signs and adhesive residue around the sign patched or listed for the painter by location.
Illumination
Failed lamps or LEDs replaced and re-lit
Sign powered at the walk, any dead lamp or LED segment replaced, the sign observed lighting evenly across all faces before signoff.
Illuminated signs observed switching on at dusk
Where signs are illuminated, viewed once after dark or at the photocell's switch point, every face lit and the timer holding the owner's schedule.
No photo
Exterior and closeout
Exterior sign bases and cabinets checked for sealant and drainage
Where exterior or monument signs are installed, sealant at bases and penetrations intact, weep holes open and no water standing inside cabinets.
No photoReplacement faces and signs on order and tracked to install
Faces flagged as damaged and any missing signs logged with an order date and expected install date, followed until the location is closed.
No photo
What usually sends this back
The failures are almost always the evidence, not the work
- A sign knocked out of line or off level by work around it after installation, left crooked because no one rechecked the row.
- A dead lamp or LED segment in an illuminated sign missed because the sign was only ever checked in daylight, never powered at the walk.
Common questions
6 answers
- What does this signage punch checklist cover?
- 9 items across 3 sections, covering alignment and faces, illumination, exterior and closeout. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The sign installer on a callback, or the GC's superintendent closing signage punch items.
- When in the schedule should this walk happen?
- During closeout, after other trades have finished around the signs and any handling damage or dead lamps have shown up.
- Why do these items ask for a photo?
- 6 of the 9 items call for photo evidence, 7 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a signage punch inspection?
- A sign knocked out of line or off level by work around it after installation, left crooked because no one rechecked the row. A dead lamp or LED segment in an illuminated sign missed because the sign was only ever checked in daylight, never powered at the walk.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished