Skip to content
RTI

Schools & education

A summer window that does not forgive a missed room.

School work runs on a calendar with no give: a wing has to be life-safety complete and finished across every classroom before students walk back in. Tag each room, phase the occupancy wing by wing, and see the open items before the handover date, not on it.

The RTI mobile app's home screen: start an inspection by scanning a tag, seven inspections waiting on a decision, and the week in numbers
An electrical rough-in inspection under review in the RTI mobile app: six jobsite photos of wiring, boxes and the panel, with send back and approve
The activity log in the RTI mobile app: the audit chain check passed with a verify now control, then today's submissions by person, tag and time
The challenge

What gets in the way, and what RTI does about it

  • Today

    The summer window is fixed and forty classrooms are in flight, so the punch that gets missed is the one nobody remembers on the last Friday in August.

    With RTI

    Every room is a tag with a mandatory checklist. A required item can't be skipped to make a date: the submit button stays locked until it is confirmed and photographed, so a missed room shows as open instead of quietly passing.

  • Today

    Occupancy is phased wing by wing but the tracking is one flat list, so the wing due first and the wing due last blur together.

    With RTI

    Tags group by wing, and the tag list rolls each wing up on its own. The phase due first reads separately from the phase due later, and you manage the handover you actually have to make.

  • Today

    The district asks for proof a room was life-safety ready before students returned and the photos are on three crew phones with no room numbers.

    With RTI

    Each photo is captured against its item on the room's tag, dated and attributable. Export the approved classrooms and every room's readiness comes out addressed to its own room, ready for the district to review, or to sign in the portal.

A real inspection point

What this looks like on your job

One tag, one checklist, and the photos that have to come with it.

Tag

B-Wing Room 118, Occupancy Ready

SCH-B-118-OCC

Sticker location
Classroom corridor door frame, Room 118
Assigned checklist
Classroom life-safety and finish signoff
  • Egress path clear, door hardware and closer operable2 photos required
  • Sprinkler heads and alarm devices unobstructed2 photos required
  • Ceiling grid, tile and lighting complete1 photo required
  • Flooring, paint and casework finished and clean1 photo required

Questions schools & education ask

3 answers

We hand over one wing at a time over the summer. Can RTI follow a phased occupancy?
Yes. Tag every room and file the tags under their wing. The tag list rolls each wing up into approved, in review, rework and not inspected, so the wing due first reads separately from the wing due in August, and you know which rooms still stand between you and a handover date.
Life-safety has to be right before a room is occupied. How is that documented per room?
Each classroom carries its own tag and checklist covering egress, fire protection and life-safety finishes. Every item is answered and photographed against that room, so occupancy readiness is documented room by room rather than signed off for a floor in the abstract.
The district wants a record before they let students back in. What can we hand them?
On the Company plan, give the district a portal login scoped to their project. They review the evidence and sign off from their phone onto the same tamper evident record, or you export a room's inspection, or the project's approved rooms as one branded turnover PDF with answers, photos and signoffs in one package.

Put it on a real job.

Tag one area, run one walk, and see the record it leaves behind.

30-day trial · No card required