Free checklist
EIFS (exterior insulation and finish)EIFS (exterior insulation and finish) punch checklist
EIFS (exterior insulation and finish) punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against manufacturer's published instructions, the applicable building code. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Defects
Cracks and delamination located and photographed
Each crack or hollow-sounding area marked and shot close plus a wide shot locating it on the elevation.
Repairs cut back to sound material
Repair opened to sound base coat and board, rebuilt through the full system, not skimmed over at the finish only.
Base, doors and lift paths checked for impact damage
Dents, gouges and punctures at the base, at doors and where lifts worked found and marked; any break that reaches the foam listed for a full-system repair.
Repairs feathered to a natural break line
Patch finish carried to a corner, joint or reveal so the repair doesn't read as a square on the wall in raking light.
No photoSills and ledges checked for ponding and staining
Top surfaces of sills, bands and trim sloped to shed water, with no ponding, dirt streaks or growth below them.
No photo
Later penetrations and repair materials
Elevations walked for penetrations added since final
Each elevation checked for holes cut after the EIFS final for conduit, cameras, signs or piping; any found sealed, with the lamina patched around them.
No photoRepair materials drawn from the original system and batch
Repair base coat, mesh and finish from the same manufacturer's system, with finish from the batch recorded for that elevation.
No photo
Sealant and signoff
Missed or failed sealant made continuous
Sealant at terminations and penetrations continuous and tooled, gaps and skips filled against base coat, primed where the EIFS manufacturer requires, not finish coat.
No remaining EIFS items before area release
All punch items on the elevation closed with photos before the area is released to turnover.
What usually sends this back
The failures are almost always the evidence, not the work
- A hairline crack chased with finish coat at the surface while the base coat behind it is still cracked.
- A hollow-sounding area tapped and noted but closed out without opening it to find why the base coat let go.
Common questions
6 answers
- What does this eifs (exterior insulation and finish) punch checklist cover?
- 9 items across 3 sections, covering defects, later penetrations and repair materials, sealant and signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The EIFS foreman on a callback, or the GC's superintendent closing envelope punch items.
- When in the schedule should this walk happen?
- During closeout, after other trades have worked against the wall and the first weather has revealed sealant misses.
- Why do these items ask for a photo?
- 5 of the 9 items call for photo evidence, 7 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails an eifs (exterior insulation and finish) punch inspection?
- A hairline crack chased with finish coat at the surface while the base coat behind it is still cracked. A hollow-sounding area tapped and noted but closed out without opening it to find why the base coat let go.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 7 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.
See all 508 checklists · 6741 items and 5984 photo requirements in total.