Selective demolition rough-in inspection checklist

Selective demolition rough-in is the last time the work is fully visible. Once the cover inspection passes and the walls, ceilings and slabs close, every defect left behind becomes a demolition bill. This checklist walks the rough-in in the order the work goes in, with the photo each item needs before it gets buried. Work is commonly verified against the applicable building code, the project specifications. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Surveys and abatement

  • Hazardous-materials survey on file for this area

    The pre-demolition survey for asbestos, lead and other regulated materials covers every room and assembly in this demo scope, not only the ones already known to be suspect.

    No photo
  • Abatement closeout matches the survey scope for this area

    The licensed abatement contractor's closeout lists each material and location removed, and it matches every item on the survey for this area; the demo crew removed no regulated material.

    No photo
  • Regulated and containment areas observed from outside only

    Any containment or regulated area still active is posted and barricaded, and the walk checks it from outside the boundary; nobody on the walk enters or opens the containment.

    No photo
02

Utilities isolated

  • Affected utilities located, isolated and capped

    Power, water, gas and any low-voltage serving the area traced to the source, locked or capped, and marked dead, not just switched off at a local device.

  • Lines to remain identified and protected

    Any live service passing through the demo zone flagged and protected so the crew works around it rather than into it.

  • Lockout record from the qualified trades reviewed

    The electrical, plumbing and gas trades' lockout record lists each circuit, valve and meter feeding the area and who locked it; the walk reads it and never de-energizes or tests anything.

    No photo
  • Locks and tags in place at each isolation point on the record

    A lock and tag hung by the qualified trade at every panel, valve or meter the record lists, observed and photographed in place without touching or operating it.

  • Fire alarm and sprinkler status for the area confirmed

    Detector covers, zone disables and sprinkler impairments are set by those contractors under the owner's impairment process, with fire watch arranged; the walk confirms status with the super.

    No photo
03

Shoring and protection

  • Shoring and bracing in place where loads are affected

    Temporary support installed where a wall, slab or beam is being removed or altered, per the engineered shoring plan.

    No photo
  • Adjacent work to remain protected

    Floors, finishes, glazing and equipment that stay are covered or hoarded, and dust partitions are sealed at the demo boundary.

  • Dust control running before cutting and breaking start

    HEPA vacuums, misting or negative air set up as the demolition plan describes, and return grilles and open duct in the zone sealed so dust is not pulled into other areas.

04

Clearance and salvage

  • Hazardous-material clearance obtained before disturbance

    Written clearance from the owner's independent air-monitoring consultant covering this specific area is in hand before any material is disturbed.

  • Salvage and owner-retained items tagged

    Items marked for salvage or reuse tagged and, where fragile, removed and stored before general demolition begins.

    No photo
05

Removal layout

  • Cut and removal lines marked on every surface

    Limit and saw-cut lines marked to the demolition drawings; slab and wall scanned by the project's method before any saw cut or core, tendons and conduit marked.

  • Structural cuts limited to the engineer's demolition plan

    Any beam, column, bearing wall or slab area in the removal scope appears on the engineer's demolition or shoring plan, and the cutting sequence is reviewed with the demo foreman first.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • A circuit or branch line assumed dead off the panel schedule, then cut into live because it was never traced and locked out at the source.
  • Demolition started in a room the owner's air-monitoring consultant had not yet cleared, disturbing material that then shuts the area down.
  • Salvage items the owner asked to keep torn out with the debris because nobody tagged them before the crew arrived.

Common questions

6 answers

What does this selective demolition rough-in checklist cover?
15 items across 5 sections, covering surveys and abatement, utilities isolated, shoring and protection, clearance and salvage, and more. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The GC's superintendent releasing the area to the demolition crew, walking it with the demo foreman.
When in the schedule should this walk happen?
Immediately before demolition starts in each area, after utilities are isolated and the owner's independent consultant has cleared any abatement, so a live line or undisturbed hazard is caught before the first wall is opened.
Why do these items ask for a photo?
7 of the 15 items call for photo evidence, 9 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a selective demolition rough-in inspection?
A circuit or branch line assumed dead off the panel schedule, then cut into live because it was never traced and locked out at the source. Demolition started in a room the owner's air-monitoring consultant had not yet cleared, disturbing material that then shuts the area down. Salvage items the owner asked to keep torn out with the debris because nobody tagged them before the crew arrived.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 9 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.