Precast concretePrecast concrete punch checklist
Precast concrete punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against PCI guidance, the applicable building code. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Defects and patching
Spalls, cracks and chips located and photographed
A close shot of each spall, crack or chip plus a wide shot locating the panel on the elevation.
Patches placed and finished to match
Patch material sound and bonded, texture and color worked to blend with the surrounding panel face.
Patch material label matches the precaster's repair procedure
Repair mortar bag or kit label checked against the product the precaster's repair procedure names before any patch is mixed.
No photoPanel faces cleaned of grout, paint and overspray
Each elevation walked for grout smears, paint overspray and efflorescence, cleaned with methods the precaster allows so the finish isn't etched.
Later work and records
Precast checked for coring and anchors not on the drawings
Exposed members and connections looked over for holes, cores or anchors added by other trades; any not on the drawings reported to the EOR before patching.
Open items keyed to piece mark and elevation
Each open item tied to its piece mark and elevation on the list so the erector's callback crew goes straight to it.
No photoRepair records assembled for turnover
The precaster's repair procedure and before and after photos of each closed repair gathered for the turnover package.
No photo
Sealant and signoff
Sealant at joints continuous and tooled
Joint sealant full and tooled against clean substrate, no skips, gaps or three-sided adhesion.
No remaining precast items before area release
All punch items on the elevation or zone closed with photos before the area is released to turnover.
What usually sends this back
The failures are almost always the evidence, not the work
- A patch color-matched to fresh precast that no longer matches the weathered panels around it.
- Sealant run over a joint that was never cleaned, so it lifts at the edges within the first season.
Verified against
Common questions
6 answers
- What does this precast concrete punch checklist cover?
- 9 items across 3 sections, covering defects and patching, later work and records, sealant and signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The GC's superintendent closing structural punch items with the erector on a callback.
- When in the schedule should this walk happen?
- During closeout, after other trades have worked around the panels and handling damage has shown itself.
- Why do these items ask for a photo?
- 6 of the 9 items call for photo evidence, 8 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a precast concrete punch inspection?
- A patch color-matched to fresh precast that no longer matches the weathered panels around it. Sealant run over a joint that was never cleaned, so it lifts at the edges within the first season.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 8 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.
See all 508 checklists · 6741 items and 5984 photo requirements in total.