Checklist library
Construction inspection checklists you can run tomorrow
Every list below is written the way a walk actually happens: sections in build order, an item that says what you are looking for, and the number of photos that would prove it. Use them on paper, or load one into RTI and let the Photo Gate hold the submit button until the evidence exists.
4 of 508 checklists · Finishes
EIFS (exterior insulation and finish) Rough-in· EIFS (exterior insulation and finish)EIFS (exterior insulation and finish) rough-in inspection checklistSubstrate, water-resistive barrier and flashing verified before any insulation board covers it4 items8 photosEIFS (exterior insulation and finish) Pre-cover· EIFS (exterior insulation and finish)EIFS (exterior insulation and finish) pre-cover inspection checklistBoard attachment, base coat and mesh embedment checked before the finish coat hides it4 items7 photosEIFS (exterior insulation and finish) Final· EIFS (exterior insulation and finish)EIFS (exterior insulation and finish) final inspection checklistFinish coat uniformity, joints, terminations and impact resistance verified on the completed wall4 items7 photosEIFS (exterior insulation and finish) Punch· EIFS (exterior insulation and finish)EIFS (exterior insulation and finish) punch checklistCloseout walk for cracks, delamination and missed sealant on the finished system4 items6 photos